Special economic zone "Saryarka"

Saryarka special economic zone

Watch the video

about SEZ "saryarka"

Special Economic Zone (sEZ) is a part of the territory of the Republic of Kazakhstan with precisely defined boundaries, on which a special legal regime of a special economic zone is applied for the implementation of priority activities.

SEZ in numbers

25,2 bln. KZT Infrastructure Investment
84,96 bln. KZT Value of Output
89,6 bln. KZT Overall Amount of Investments
858 Permanent Workplaces

Projects of participants of the SEZ

Submit a project
Valid project//Finished project
"Recycling Company" LLP

Recycling of auto junk
Cost of project - 3.4 billion tenge
workplaces created - 110 people

Capacity of project - 1. different metals - 22.740 tons; 2. synthesis gas - 2.100.000 m3.; 3. heating oil - 7.000 tons.
Foreign participance - No
Commissioning Year - 2017
Current stage - The enterprise is operating normally

«Polymet Solutions Corporation» LLP

Production of rubber-technical products
Cost of project - 1,170 billion tenge
workplaces created - 80

Capacity of project - No
Foreign participance - No
Commissioning Year - No
Current stage - No

«Karaganda Complex Alloys Plant» LLP

Production of ferrosilicon aluminum
Cost of project - 86 billion tenge
workplaces created - 1145

Capacity of project - No
Foreign participance - No
Commissioning Year - No
Current stage - No

«Karaganda-Granit Ltd» LLP

Production of facing slabs made of granite, marble and travertine
Cost of project - 0,28 billion tenge
workplaces created - 40

Capacity of project - No
Foreign participance - No
Commissioning Year - No
Current stage - No

«LITEYSHIK» LLP

Production of pipes, profiles, steel fittings
Cost of project - 0,86 billion tenge
workplaces created - 50

Capacity of project - No
Foreign participance - No
Commissioning Year - No
Current stage - No

EMK «Saryarka Energy» LLP

Production of pipes, profiles, steel fittings, tanks, reservoirs and containers
Cost of project - 0,352 billion tenge
workplaces created - 61

Capacity of project - No
Foreign participance - No
Commissioning Year - No
Current stage - No

Valid project//Finished project
«Steel Manufacturing» LLP

Production of brass products
Cost of project - 8,1 billion tenge
workplaces created - 164 people

Capacity of project - 30 thousand tons / year
Foreign participance - No
Commissioning Year - 2020
Current stage - from January 2020, a phased launch of all production lines with access to production capacity by the end of this year is planned

Valid project//Finished project
"Bohmer Armaturen" LLP

Ball Valve Manufacturing
Cost of project - 3.1 billion tenge
workplaces created - 40 people

Capacity of project - 10 thousand pieces per year
Foreign participance - Bohmer Kasachstan GmbH (Germany, 75%)
Commissioning Year - 2014
Current stage - The enterprise is operating normally

In implementation
"Otemis Ltd." LLP

Production of polymer concrete products
Cost of project - 1,2 billion tenge
workplaces created - 30 people

Capacity of project - 5 thousand per year
Foreign participance - No
Commissioning Year - 2018
Current stage - object for implementation. The possibility of selling only the object is being considered. Negotiations are underway with several potential buyers.

Valid project//Finished project
"IsoPlus Central Asia" LLP

Production of insulated pipes
Cost of project - 2.3 billion tenge
workplaces created - 88 people

Capacity of project - 30 thousand tons per year
Foreign participance - IsoPlus GmbH (Germany, 75%)
Commissioning Year - 2014
Current stage - The enterprise is operating normally

Valid project//Finished project
«Seven Refractories Central Asia» LLP

Production of refractory materials
Cost of project - 1 billion tenge
workplaces created - 59 people

Capacity of project - 38 thousand tons / year
Foreign participance - Seven Refractories GMBH (Austria, 70%)
Commissioning Year - 2017
Current stage - The enterprise is operating normally

"Arcus Invest" LLP

Production of spare parts for railway cars
Cost of project - 4.4 billion tenge
workplaces created - 126

Capacity of project - 6,000 tons per year
Foreign participance - No
Commissioning Year - 2021
Current stage - on the development of design estimates for the project

Valid project//Finished project
"OUTLOOK" LLP

Production of hardware and software systems for photo and video recording
Cost of project - 0,013 billion tenge
workplaces created - 12 people

Capacity of project - No
Foreign participance - No
Commissioning Year - No
Current stage - The enterprise is operating normally

In implementation
"JV Berkut" LLP

Industrial explosives production
Cost of project - 8,125 billion tenge
workplaces created - 120 people

Capacity of project - 40 thousand tons / year
Foreign participance - Yunnan Industrial Explosive Group Co., Ltd., China
Commissioning Year - 2019
Current stage - Construction and installation work is underway

Valid project//Finished project
"Thermo Form" LLP

Production of vibronic bulk shaped refractory products
Cost of project - 0.134 billion tenge
workplaces created - 10 people

Capacity of project - 1800 tons per year
Foreign participance - Austria
Commissioning Year - No
Current stage - The enterprise is operating normally

«Saryarka LED»

Production of LED lamps and street lighting poles
Cost of project - 0.07 bln. tenge
workplaces created - 50 people

Capacity of project - 50,000 lighting fixtures / year, 4,000 street lighting poles
Foreign participance - No
Commissioning Year - 2021
Current stage - a land plot is issued. Design estimates work has begun.

«Alloyco» LLP

Production of ferrosilicon manganese
Cost of project - 1,139 bln. tenge
workplaces created - 100

Capacity of project - 6800 tons per year
Foreign participance - No
Commissioning Year - 2021
Current stage - at the stage of registration of the land

«NSPE-Ferrroalloys» LLP

Production of silicocalcium
Cost of project - 1 billion tenge
workplaces created - 60 people

Capacity of project - 18,000 tons
Foreign participance - No
Commissioning Year - 2021
Current stage - at the stage of registration of the land

Valid project//Finished project
"Tau-Ken Temir" LLP

Technical silicon production
Cost of project - 48.2 billion tenge
workplaces created - 384 people

Capacity of project - 23 thousand tons / year
Foreign participance - No
Commissioning Year - 2015
Current stage - The enterprise is operating normally

Geography accommodating participants

"Recycling Company" LLP

Recycling of auto junk

Cost: 3.4 billion tenge

Capacity of project: 1. different metals - 22.740 tons; 2. synthesis gas - 2.100.000 m3.; 3. heating oil - 7.000 tons.

Workplaces: 110 people people

Foreign participation:

No

Current stage: The enterprise is operating normally

Commissioning year: 2017 year

«Polymet Solutions Corporation» LLP

Production of rubber-technical products

Cost: 1,170 billion tenge

Workplaces: 80 people

«Karaganda Complex Alloys Plant» LLP

Production of ferrosilicon aluminum

Cost: 86 billion tenge

Workplaces: 1145 people

«Karaganda-Granit Ltd» LLP

Production of facing slabs made of granite, marble and travertine

Cost: 0,28 billion tenge

Workplaces: 40 people

«LITEYSHIK» LLP

Production of pipes, profiles, steel fittings

Cost: 0,86 billion tenge

Workplaces: 50 people

EMK «Saryarka Energy» LLP

Production of pipes, profiles, steel fittings, tanks, reservoirs and containers

Cost: 0,352 billion tenge

Workplaces: 61 people

«Steel Manufacturing» LLP

Production of brass products

Cost: 8,1 billion tenge

Capacity of project: 30 thousand tons / year

Workplaces: 164 people people

Foreign participation:

No

Current stage: from January 2020, a phased launch of all production lines with access to production capacity by the end of this year is planned

Commissioning year: 2020 year

"Bohmer Armaturen" LLP

Ball Valve Manufacturing

Cost: 3.1 billion tenge

Capacity of project: 10 thousand pieces per year

Workplaces: 40 people people

Foreign participation:

Bohmer Kasachstan GmbH (Germany, 75%)

Current stage: The enterprise is operating normally

Commissioning year: 2014 year

"Otemis Ltd." LLP

Production of polymer concrete products

Cost: 1,2 billion tenge

Capacity of project: 5 thousand per year

Workplaces: 30 people people

Foreign participation:

No

Current stage: object for implementation. The possibility of selling only the object is being considered. Negotiations are underway with several potential buyers.

Commissioning year: 2018 year

"IsoPlus Central Asia" LLP

Production of insulated pipes

Cost: 2.3 billion tenge

Capacity of project: 30 thousand tons per year

Workplaces: 88 people people

Foreign participation:

IsoPlus GmbH (Germany, 75%)

Current stage: The enterprise is operating normally

Commissioning year: 2014 year

«Seven Refractories Central Asia» LLP

Production of refractory materials

Cost: 1 billion tenge

Capacity of project: 38 thousand tons / year

Workplaces: 59 people people

Foreign participation:

Seven Refractories GMBH (Austria, 70%)

Current stage: The enterprise is operating normally

Commissioning year: 2017 year

"Arcus Invest" LLP

Production of spare parts for railway cars

Cost: 4.4 billion tenge

Capacity of project: 6,000 tons per year

Workplaces: 126 people

Foreign participation:

No

Current stage: on the development of design estimates for the project

Commissioning year: 2021 year

"OUTLOOK" LLP

Production of hardware and software systems for photo and video recording

Cost: 0,013 billion tenge

Workplaces: 12 people people

Foreign participation:

No

Current stage: The enterprise is operating normally

"JV Berkut" LLP

Industrial explosives production

Cost: 8,125 billion tenge

Capacity of project: 40 thousand tons / year

Workplaces: 120 people people

Foreign participation:

Yunnan Industrial Explosive Group Co., Ltd., China

Current stage: Construction and installation work is underway

Commissioning year: 2019 year

"Thermo Form" LLP

Production of vibronic bulk shaped refractory products

Cost: 0.134 billion tenge

Capacity of project: 1800 tons per year

Workplaces: 10 people people

Foreign participation:

Austria

Current stage: The enterprise is operating normally

«Saryarka LED»

Production of LED lamps and street lighting poles

Cost: 0.07 bln. tenge

Capacity of project: 50,000 lighting fixtures / year, 4,000 street lighting poles

Workplaces: 50 people people

Current stage: a land plot is issued. Design estimates work has begun.

Commissioning year: 2021 year

«Alloyco» LLP

Production of ferrosilicon manganese

Cost: 1,139 bln. tenge

Capacity of project: 6800 tons per year

Workplaces: 100 people

Current stage: at the stage of registration of the land

Commissioning year: 2021 year

«NSPE-Ferrroalloys» LLP

Production of silicocalcium

Cost: 1 billion tenge

Capacity of project: 18,000 tons

Workplaces: 60 people people

Current stage: at the stage of registration of the land

Commissioning year: 2021 year

"Tau-Ken Temir" LLP

Technical silicon production

Cost: 48.2 billion tenge

Capacity of project: 23 thousand tons / year

Workplaces: 384 people people

Foreign participation:

No

Current stage: The enterprise is operating normally

Commissioning year: 2015 year

Conditions for obtaining preferences:

  1. Registration as a taxpayer on the territory of the SEZ.
  2. Register as a member of the SEZ.
  3. The absence of structural units outside the SEZ.

Activities priority

Electrical Equipment Manufacturing

Metallurgical industry

Manufacture of rubber and plastic products

Manufacture of rubber and plastic products

Manufacture of rubber and plastic products

Vehicle manufacturing

Production of building materials and non-metal products

Benefits and preferences

0 %

Corporate income tax
Property tax
Land tax

0 %

Payment for use of land steads
Customs duties

Simplified procedure for recruiting foreign labor

Provision of preferential INFRASTRUCTURE services

Benefits utilities

Water supply

from Karaganda-Su (1 cube meter)

255 tenge

Electricity

from Karaganda-Energosbyt (1 kWh)

11,42 tenge

Railway transportation

“Sortirovochnaya station” -
“Industrialnaya station” for 1 carriage-km

3485,72 tenge

The provision of technical connection conditions

Free